






1. |
Relationship Between the Optical Band Gap and Mole Fraction of Some Synthetic Ternary Heterostructures Systems |
| 248-252 |
2. |
Finite Element Analysis for Hydraulic Pressure Piping System for Effecting Design Change to Curb the Tendency of Crack in the Critical Region of Concern |
| 253-256 |
3. |
Stress Analysis of Notch Specimen by using Reflection Polariscope Technique |
| 257-262 |
4. |
Utilizing Flow Simulation in the Design Phase of a Die Casting Die to Optimize Design Parameters while Validating through Experimentation during Trials |
| 263-269 |
.5 |
Achieving Mass Reduction in the Spur Gear using Topology Optimization for Design Evaluation and Analysis |
| 270-274 |
|